Thanks for the detailed report, the request and response made this easy to track down!
The new piece of land comes with an old building on it, and it has to be torn down before you get the new plots. That’s why the server refuses the new hall. Your tab is most likely still running a version from before I added this rule, so it builds the hall itself, then the server takes it back a second later. That old version doesn’t show the demolition option at all.
Please reload the page. You should then see “Tear down” in the Build tab, with an excavator (cheap, 30 minutes) or a blast (instant, ten times the price). If you still can’t build after that, please let me know.
Sorry about that. Your progress is safe on the server.