Finished the first shift with 98.84% reliability and $394k profit, then started day two with solar and wind online. Starting the gas peaker late made the morning shortage visible in the supply chart; raising coal output and importing power helped me recover. I liked having reliability, profit and carbon intensity as separate goals. One clarity issue: the report showed a 49.87 Hz minimum despite unserved energy, so a breakdown explaining what caused the lost supply would help me learn from the run. The overnight construction and automatic renewable curtailment gave me a good reason to rethink my settings on day two.